Roadworks: REPA – Reconstruction Works - $2M
Tropical Cyclone Niran took a heavy toll on the Cassowary Coast Region causing widespread damage to many roads. Cheshire Contractors were successfully awarded three roadworks contracts for the Restoration of Essential Public Assets (REPA).
Works involved include but are not limited to the reconstruction of unsealed roads including the import of material, placement of material and compaction of material across various roads spread throughout the whole Cassowary Coast region.
Earthworks: Cairns Model Aero Club
Cheshire Contractors were contracted to construct a new runway and car park for Cairns Model Aero Club. We are privileged to work with a community-based not for profit club whose diverse members are passionate about providing a safe, inclusive, and fun environment that pursue all facets of remote-control aeromodelling within Cairns and the surrounding regional areas. With this new upgrade, the club seeks to establish itself as the “club of choice” for remote-control aeromodelling within the Cairns region.
Roadworks: Mourilyan Harbour Road – Pavement Replacement $600K
The last 700m of Mourilyan Harbour Road entering the Port was showing significant deterioration. Ports North determined that large areas of the pavement were at end of life and required either repair or replacement. Cheshire Contractors were pleased to have been awarded the contract for complete replacement of pavement roadworks and associated works.
Earthworks & Roadworks: IDEC
Cheshire Contractors were contracted by IDEC to assist with the construction of an S Band Doppler Radar Tower in Richmond FNQ for The Bureau of Meteorology. Earthworks we completed on this project included survey, clearing, and grubbing, bulk and detailed earthworks, rock protection, and roadworks. Cheshire Contractors are pleased to have worked with IDEC in supporting the local community throughout the construction of this project.
Earthworks & Roadworks: Blenners Transport QLD PTY LTD $800k
Seaview Estate Stage 3 is a 20-lot subdivision. Works consisted of erosion and sediment controls for protection of the environment, bulk earthworks, construction of roads, pathways and the installation of underground services including storm water, sewer, and water reticulation mains. Cheshire Contractors completed the previous stages of this subdivision for Blenners Transport Pty Ltd in the past and continue to work with Blenners to complete residential and commercial developments.
Roadworks: Flinders Shire Council - $1.8M
Brodie Street in Hughenden is one of the main thoroughfares for travelers around Queensland. Flinders Shire Council contracted Cheshire Contractors to do a complete upgrade on Brodie Street, which involved lowering the existing road levels across the road and to the surrounding shops, installing new asphalting, and line marking to comply with disability access standards. The structures in the street were also revitalized with a fresh new look which included seated areas with USB charging stations and extended seating areas to the local cafes. A dual car charger was also installed for the environmentally friendly vehicles driving in and around Hughenden. This project was completed in time and on budget while working with the Flinders Shire Council, the community, and the local businesses of Brodie Street.
Earthworks: Flinders Shire Council - $11M
Cheshire Contractors were contracted by Flinders Shire Council to complete The Hughenden Recreational Lake and Surrounds Major Works contract. The construction of the recreational lake is located on the eastern side of the Hughenden township on land, which is adjacent to the Historical Coolabah Tree, this tree holds cultural significance linked to two relief expeditions searching for Burke & Wills, the site is locally known as Station Creek. The works undertaken saw 800,000 cubic metres of dirt excavated with the lake being approximately 800m long and 250m wide and the average depth of 3.2m. The project required the construction of a 4-meter-high earth wall embankment, spillway, and excavation of the actual lake area, a boat ramp, jetty, and landscaping around the edge of the lake and surrounding parklands. Cheshire Contractors are proud to be part of what is a major asset to the local community, which is being enjoyed by the local residents and tourists visiting the region.
Aquaculture: Evelake PTY LTD - $1M
With the accelerated growth of Aquaculture in the North Queensland region, Cheshire Contractors are helping to progress the industry and undertook works at the Cardwell Prawn Farm. These works included the Design and Construct of the project, 250,000m3 in Bulk Earthworks for 22 Ponds and Associated Feed Channels, Outlet Channels and Remediation Area to the Aquaculture Facility.
The project consisted of 2 Stages - Stage 1 saw the construction of ponds 1- 22, the main inlet channel, the main outlet channel with the excess fill being used to construct various ponds between pond 23 and pond 52. Stage 2 will see the completion of all 52 ponds and the remediation area, likely to commence upon completion of Stage 1.
Aquaculture: Seafarms PTY LTD - $825K
Cheshire Contractors completed works onsite at the Crystal Bay Prawn farm. This project was a Design and Construct, which included upgrades to the intake ponds, and supply and installation of Pre-Cast Monks that were fabricated in house to our specifications. Cheshire Contractors were pleased to help the local community through employment opportunities and buying local.
Roadworks: Hinchinbrook Shire Council – $500K
Cheshire Contractors were awarded the contract for Long Pocket Road widening. This roadworks project consisted of a road shoulder widening and culvert installations. As always, the local weather was a challenge, Cheshire Contractors overcame this challenge within the allotted timeframe and presented the works on schedule and on budget. Cheshire Contractors adhered to all local content requirements and ensured fair and reasonable opportunity to local suppliers.
Roadworks: Hinchinbrook Shire Council - $250K
Hinchinbrook Shire Council awarded Cheshire Contractors this roadworks contract. The roadworks consisted of the implementation of traffic control devices and erosion and sediment control devices, cut and fill of subgrade design levels, trimming and compaction of subgrade layer, construction of concrete structures, Installation of pavement layers, as well as the supply and install of the bitumen seal, and Line Marking.
Roadworks: Hinchinbrook Shire Council - $195K
The works that were undertaken included the implementation of the required traffic control and erosion and sediment control devices, the cut and fill to the subgrade design levels, Trimming and compaction of subgrade layer, Construction of concrete structures, Installation of pavement layers, and the supply and install bitumen seal, as well as Line Marking.
Earthworks & Roadworks: Department of National Parks, Sports and Racing - $300K
These works consisted of the upgrade of an existing culvert crossing from three 1.2m diameter reinforced concrete pipes to bridge beams with a 9m span. The works involved the demolition and removal of the existing pipes and headwalls, followed by the construction of the foundations, abutments, and wing walls. Three 9m precast beams where then placed to construct the bridge crossing. Works also included rock lining the creek bed and banks and realigning, preparing, placing material, compacting, and trimming the bridge and drains.
Cheshire Contractors are very conscious of the environmental impact on the downstream fauna and flora and erosion controls were implemented throughout the job. Some of the works being carried out 2m below the creek bed, and with rainfall totals of 762mm in February and March, this meant overcoming a few challenges. Also, the location of the bridge meant the parks and camping areas were closed until the job was complete. Many challenges were faced with the nature of the job and the time of year and Cheshire Contractors succeeded in executing the works in a timely manner.
Roadworks: Downer EDI Ltd - $2.4m
Cheshire Contractors were successfully awarded this roadworks contract. The project involved upgrading 5kms of the Bruce Highway, including new overtaking lanes, service roads and lane widenings. Works that were undertaken include, clearing and grubbing, stripping and re-spreading topsoil, cut to fill, embankment, removal of unsuitable material, placement, compaction and trimming of gravel to subgrade. Cheshire Contractors, where possible, supported local business and suppliers in the area.
Earthworks: CS Energy Ltd – $2.2m base contract annually plus additional civil works.
Cheshire Contractors were awarded the contract for Ash Handling and Civil Works at the Callide Power Station. The ongoing contract over 2 years included Ash Cartage, Bund Building, Ash Trucking, Dust Suppression, Waste Containment Handing and Addition Civil Works. We have been working closely with CS Energy to meet our KPI’s and meet all obligations with Environmental and WHS Plans.
Roadworks: Pensar Civil PTY LTD
This project covered 4km of centerline widening upgrade works to the Bruce Highway South of Cairns. This detailed construction was undertaken to the Department of Transport and Main Roads specifications. Our excavators, graders were equipped with UTS & GPS controls and supported with our survey personnel. Works were completed on time and budget with minimal impact to traffic.
Earthworks: Wilmar Bioethanol PTY LTD - $1.2m
After the successful completion of the Plane Creek Mill Molasses Dam, Cheshire Contractors were shortlisted to tender on the ET02 Dunder Dam Upgrade at Oonooie. Cheshire Contractors were selected as the successful tenderer, which is a testament to our quality, experience, and competitive pricing.
Upon commencement of the dam refurbishment various tasks were undertaken including removal of 10,000L of bio-dunder from the existing dam, excavation to reshape, reform and clay line the internal dam, installation of new concrete ring beams to the dam perimeter and fencing of the new dam area. Cheshire Contractors were able to complete this contract on time and under budget through unseasonal weather conditions and working in conjunction with other Principal appointed Contractors.
Earthworks & Roadworks: Civil Mining & Construction PTY LTD - $3m
The project covers 14km of roadworks to upgrade the Peninsula Development Road 98km north of Coen, QLD. Over 100,000m3 of earthworks to road excavation and embankment construction was undertaken to the Department of Transport and Main Roads specifications. The materials encountered ranged from -75mm to +1000mm in particle size including insitu hard rock. The handling of these materials required various methodologies utilising scrapers, excavators, dozers, articulated dump trucks, road trains, and graders to excavate, cart, and place. All construction works were undertaken under traffic adhering to strict traffic management procedures and plans. Our excavators, scrapers and graders were equipped with UTS & GPS controls and supported with our survey personnel all works were successfully completed without survey pegging.
Earthworks: ADCO Construction - $1.2m
Cheshire Contractors were the successful tenderers for the civil works to the Tobruk pool redevelopment. Our previous successful undertakings with ADCO Constructions in the site preparation and carpark construction on the Australian Federal Police building showed our commitment to quality and timely delivery of these work.
The scope of works involved the bulk earthworks to the whole site for the excavation of the new 50m and 25m pools to FINA specifications. Earthworks to the new building foundations alongside associated civil works. Our scope of works also includes the construction of a 140-space asphalt carpark.
Roadworks: CS Energy Ltd - $315K
Cheshire Contractors were engaged by CS Energy to complete an array of various civil construction works. One scope of work includes the pavement rehabilitation, retrimming, resealing and repairs to asphalt of carpark and various internal streets. We also supplied and install guardrails to meet required specifications. The contract completion time was 2 weeks which was achieved on time and budget with minimal disruption to the client.
Earthworks: CS Energy Ltd - $800K
Cheshire Contractors were the successful tenderer to undertake the construction of a new coal stockpile site for the stockpiling of 400-450kT of coal at the Callide Power Station. The works comprised of the construction of embankments to the perimeter of the coal stockpile comprising of an area of over 4ha. A total of 200,000m3 of ash was used to construction the embankments and achieve final levels to the stockpile site. Works were also undertaken to win, cart and place a clay capping layer and geofabric lined rock protection to the embankments. Additional works were undertaken for road accesses and stormwater drainage infrastructure. The knowledge and experience of our personnel in the construction of bulk earthworks and the management of liquefied soils gave us the capabilities to successfully deliver this project.
Subdivision: Private Developers - $2.7m
Cheshire Contractors were awarded a 40-lot residential subdivision south of Cairns. Construction of this sub-division provided many challenges, from weather delays to local constraints. Cheshire Contractors experienced staff overcame all these factors to provide the client with a project that was completed on time and on budget. The works on this project included bulk earthworks, storm water drainage, sewerage & water reticulation, roadwork’s, and installation of electrical and telecommunication conduit.
Subdivision: Department of Aboriginal and Torres Strait Islander Multicultural Affairs (DATSIMA - Queensland Government) - $2.9M Contract Time 16 weeks - Completion Time 6 weeks.
Cheshire Contractors were successful in being awarded the contract to complete works for the Aurukun 26 Lot Residential Subdivision (Stage 2). Major works to be undertaken throughout this project include Earthworks, Road works, Sewerage reticulation, Water reticulation, Electrical and Communications ducting and wiring, Stormwater drainage and Landscaping.
Earthworks: Seafarm PTY LTD
This project involved the removal of existing flume pipes located in operational prawn farm ponds as well as excavation of 2km of trenches to install new poly pipe. Once the pipe was installed, we were required to backfill, compact and trim existing roads.
Earthworks: ADCO Constructions - $369K
Cheshire Contractors were awarded the civil contract for the new Australian Federal Police building located in North Cairns.
The contract was separated into two stages:
Stage 1 - Initial site preparation works for the building contractor.
Stage 2 - Car park construction and site drainage.
Stage 1 works included, cut to fill and compaction of 5500 sq/m for the proposed building. It also included capping this area with 100mm of crusher dust to waterproof the site for the building contractors.
Stage 2 works included the supply and installation of box culverts, 225mm drainage pipe and subsequent pits. Further works included the preparation of subbase and base for a 2200 sq/m car park, installation of layback and barrier kerbing and finally the supply and lay of 30mm depth asphalt to the entire car park.
Roadworks: Hinchinbrook Shire Council - $1.5M
Cheshire Contractors Pty Ltd were successfully awarded the contract to undertake further NDRRA roadworks including but not limited to the replace, repair and reconstruction of flood damaged pavement on multiple roads and streets within the Hinchinbrook Shire.
The works involved the excavation and reconstruction of over 30,000m2 of pavements. Despite challenges such as the weather and supply of materials, the project was completed within the Contract timeframes. All works were completed to the Department of Main Roads specifications through the implementation of our Quality System.
Roadworks: Hinchinbrook Shire Council - $1.1M
Cheshire Contractors Pty Ltd were successfully awarded the contract to undertake NDRRA roadworks including pavement rehabilitation on Warrens Hill Road remaining sections which is located within the Hinchinbrook shire.
The works involved the excavation and reconstruction of the remaining sections to Warrens Hill Road. This involved the excavation, disposal, and reconstruction of pavements from 0.3m to 1.2m depth for 3.9km of road with 8.2m formation width. All works were staged to be completed under traffic control and programmed to suit curing times of cement stabilised pavements. Despite challenges such as the weather and supply of materials, the project was completed within the Contract timeframes. All works were completed to the Department of Main Roads specifications through the implementation of our Quality System.
Earthworks: Racing Queensland - $285K
Through a national tender process, Cheshire Contractors were successfully awarded the Principal Contractor role to upgrade the Ipswich Racecourse by Racing Queensland.
The project included the stripping and reshaping of two thirds of the track whilst a vigorous renovation was undertaken on the main straight, 400m and 1650m chutes. Once the track had been reshaped, the entire work zone was solid turfed with Oakridge Kikuyu grown locally for this specific project. Prior to this, a mixture of amendments was added to the soil profile to enhance growth of the new turf. The renovation involved coring at a 25mm diameter and 150mm depth, scarifying with solid knives on a Top-maker and Topdressing with 250 ton of washed local sand.
Through our quality management systems and site-specific project management, all contractual timelines were easily met, providing an additional 2 weeks for the grow in phase. This was quite significant for this project, as the work schedule was extremely time sensitive with a definite return to racing date set.
Below is an extract from Racing Queensland’s website.
"Cheshire has been chosen to deliver this project due to their extensive knowledge and credentials of track restorations and for their sports turf construction experience including working as sub-contractors on the recently completed Toowoomba and Cairns Racecourse upgrades."
Earthworks: Latrobe Golf Club - $337K
Cheshire Contractors Pty Ltd were awarded the Latrobe Golf Club Enabling works contract. The reconstruction works were brought about due to a major sewer line upgrade by Melbourne Water.
The works that we completed included the construction of three complete tee and green complexes. The works were fulfilled in conjunction with golf course architects Ogilvy-Clayton and overseen by Melbourne Water and the Latrobe Golf Club.
The scope of works included;
Earthworks: Strathayr - $1.1M
Through our commitment to the project, exceptional timely delivery, and quality of product through the completion of Cannon Park Racecourse, we have established a relationship with Racing Queensland Limited as a preferred contractor to deliver specialist thoroughbred racecourses throughout Queensland. This extended to our successful selection as the civil works contractor for the Clifford Park Racecourse Upgrade working in conjunction with StrathAyr.
The project involved the reconstruction of the thoroughbred racing and training facilities at the Clifford Park Racecourse, Toowoomba.
Cheshire Contractors Pty Ltd were engaged as a key subcontractor to the Principal Contractor StrathAyr, delivering the civil construction component of the project. The works included the stripping of the existing synthetic course proper and two training tracks with a methodology to minimize contamination and maximize quantities available for re-use, earthworks to all tracks to promote drainage, re-construction of training tracks with reclaimed synthetic medium and sand. In conjunction with the track works, CCPL were engaged to construct the main asphalt car park including custom horse loading ramps and a complete storm water catchment system to enhance the clubs water sustainability.
All works were delivered with our experienced personnel to the specific timelines, budgets and specifications directed by Racing Queensland Limited.
Subdivision: Department of Housing & Public Works (Queensland Government) – $4.5M
This project involved the supply and construction of civil works associated with the Aurukun Residential Subdivision Project (stage 1) located in the town centre, Aurukun.
The project covered stage 1 (30 lots) and included bulk earthworks, road works, stormwater drainage, water reticulation, sewerage reticulation, 7m deep pre-cast fiberglass sewage pump station including SCADA, telemetry and backup generator, polyethylene sewer rising main, electrical ducting and wiring, telecommunications ducting and landscaping.
Roadworks: Hinchinbrook Shire Council - $1.25M
Cheshire Contractors were awarded the tender to undertake NDRRA road reconstruction to various roads within the Hinchinbrook Shire. The pavement reconstruction involved excavation to damaged pavements to depths of 800mm, disposal of spoil, laying geo-grid to bottom of excavation, construction geofabric wrapped rock blankets to depth of 400mm, reconstruction of road pavements with 400mm of gravel and moist curing of completed works. All materials were Principal supplied with liaison and ordering of materials undertaken by Cheshire Contractors P/L.
Earthworks: Sucrogen Bio Ethanol - $1.6M
Cheshire Contractors were engaged by Sucrogen Bio Ethanol PTY LTD to undertake the civil works for the 67ML molasses storage bladder located to the south of the Plane Creek Sugar Mill in Sarina, QLD. The construction of this project was undertaken on a greenfield site with all the clearing and mulching undertaken by the client prior to our establishment. Cheshire Contractors were engaged to complete the bulk earthworks, roadworks, stormwater drainage and construction of concrete structures to the molasses dam.
The site was located at the base of an existing hill from which the southern and western dam walls were predominantly sculpted from. Bulk earthworks were completed in the order of 40,000m3 of cut to fill earthworks required to construct the northern and eastern dam walls. The earthworks encountered difficulty through extensive rock outcrops throughout the areas in cut in which blasting was unable to be undertaken due to the site being located within a built-up area. Mechanical means of excavation of this rock was undertaken with a 35t excavator equipped with a hydraulic hammer and a D9T dozer. Through our initiative and research, we also purchased a Boulder Buster which was implemented to split/break larger rocks. Upon completion over 3,000m3 of rock was excavated.
Concrete lined cut off drains were constructed along the cut faces in the hill to divert stormwater runoff around the bladder. Additional concrete works included the construction of intake and discharge pits, overflow spillway and a 1m deep reinforced concrete anchor beam around the top of the dam walls for the anchoring of the bladder lining and cover.
Earthworks & Roadworks: Cairns Regional Council - $1.5M
Cheshire Contractors undertook the replacement of the existing low level concrete crossing over Cooper Creek, Cape Tribulation with 9/3600x2400 SLBC culverts constructed on strip footings extending 1.5m into the creek bed. Upgrades to the road approaches included extensive embankment earthworks, cement treated pavement base, bitumen seal and concrete causeway over new culverts. Works had to be staged in four sections to maintain water flow and vehicular access.
With the project site being located in the Wet Tropics World Heritage area extensive environmental conditions were imposed on the works and were met during the construction through the implementation of our Environmental Management Plan. The project wasn’t without its share of setbacks, the most significant being a Q50 flood during construction, forcing CCPL to regularly amend works and ultimately implement design changes. These successful changes ensured project completion on time, within budget to required safety, environmental and quality standards.
Earthworks & Roadworks: Mainbrace Construction (QLD) PTY LTD $1.06M
The construction of the building platform & earthworks to the car park included 6300m3 of cut to fill earthworks & importing 5000m3 CBR15 fill. The building platform was excavated of unsuitable material to a depth of 1m & backfilled to 1.5m above the subgrade including underlay of A34 geofabric carried out to AS3798 Level 1 compaction testing specifications. 8500m2 of asphalt car park was constructed including base & sub-base pavements, 1000m kerbing, & street lighting associated with the new Woolworths supermarket.
Further external roadwork’s consisting of a roundabout on Tully-Mission Beach Road (State controlled road). Through the construction period the project received over 2000mm of rain. Our local experience with working in wet conditions & extensive resources ensured the project was delivered within time & to the satisfaction of the client. The environmental impacts from the rain events were managed to the satisfaction of the client, Council, DMR, and relevant authorities.
Subdivision: Private Developers - $1.2M
This subdivision was a 22 Lot rural residential subdivision located on Alexander Drive Mission Beach. Cheshire Contractors Pty Ltd was approached by the engineers to complete the unfinished works on this project. This had presented a challenging situation to us as the previous developments had been left without appropriate erosion and sediment control measures during the wet season. Our experience in the area and experienced staff returned the project on course and delivered a final project for the client with a minimum of fuss. The project included road works of approx. 700m with 2 coat seal and layback kerb & channel, extensive retaining wall works, water reticulation and stormwater drainage.
Subdivision: Baracon Construction PTY LTD - $5.4M
This project was a 143-lot group title subdivision. The construction of the subdivision was carried out over 2 stages & included two external intersections on El-Arish-Mission Bch Rd (State controlled road). Construction works included road works, stormwater drainage, water reticulation, sewer reticulation, installation of sewer pump stations (inc. rising mains), & electrical & telecommunications installations.
CCPL established a close working relationship with the client for the development & provided vital information to the client to assist in the designing of the proposed development achieving approximately $2M in cost savings. During the construction of the project extensive delays as a result of changes in engineering design, Council approvals & weather conditions were experienced. Through our commitment to the project & experience we provided support to the client to obtain the necessary approvals and ensured that minimal time was lost. As this project was located within an environmentally sensitive area, strict Cassowary habitat conditions had been applied by DEWHA. CCPL applied a high level of environmental management to the delivery of the project to ensure these conditions were met.
Earthworks & Roadworks: Hinchinbrook Shire Council - $600K
The new crossing consisted of a 3/3300 x 2100 SLBC (skewed) with cast insitu concrete base slabs, aprons, wingwalls & headwalls constructed to Main Roads specifications. 180m of road was also constructed which included cement treated base course & concrete pavement over the new culverts. A detour track of 2.5km was constructed to allow local residents continued access during the construction period which allowed us to undertake our works of full removal of the existing crossing & construction of the new crossing without interruptions.
With the project commencing, we were also placed with the responsibility to maintain access to the local residents for the oncoming wet season. This was achieved with the new crossing being partially completed prior to the Christmas Holidays. During the construction of this project, CCPL applied QA processes & met strict environmental conditions through the implementation of our environmental management plan.
WE'RE HIGHLY SKILLED IN ALL AREAS OF EARTHMOVING
WANT TO HIRE US?
Phone:
07 4052 2700
Address:
Cairns Office
Office Floor 1, 546-550 Mulgrave Rd,
Woree, QLD 4868
Hughenden Office
9 Lammermoor St,
Hughenden, QLD 4821
ABN: 75124700385